TSIBERSoftware architecture
All services

Fractional CTO

One technical decision instead of two retellings.

The situation

The developers say one thing, the business hears another.

Between the people who pay and the people who build stands someone who translates. Usually he translates honestly and still loses: one way goes "we'll do it in a month" instead of "in a month, if this doesn't surface"; the other way comes back "we need a button" instead of the task the button followed from.

What happens

One person speaks to the business in the language of business, and to the developers and the code in the language of IT. That is the technical owner — not a project manager: he answers for the result, not for tickets moving across a board. Interim CTO, CTO on demand — the market has several names for the role; the difference here is that this one also writes the code.

Decisions are made and written so the next hire can read them. Not minutes of a meeting, but the reason: why this was chosen, what the alternative was, under what condition the decision stops being right.

Promises come with a price. Every deadline names what specifically could break it — before it does.

Ownership comes back to you. The role is temporary by definition. The client sets the term: he decides when he takes the system back. After that I stay a phone call away.

What you get

One technical decision instead of two retellings. Written reasons behind the decisions, which stay when I leave. And a team that keeps working after the handover.

How it went

A shelf-layout and planogram system for a retail chain — four years of answering for the result and for a team of four, from an empty repository to the daily work of category managers.

In another system, trading equipment, I wrote all the documentation myself. Months have passed since I handed it over, and the architecture still matches the code.

The role came back in banking, in oil and gas, in retail and in trading equipment.

What this is not

Project management. Boards, statuses and utilisation reports are not this work, and if that is what you need, you need a different person.

And not a permanent position. The role is temporary, and its proper end is the moment you no longer need it.

How to start

Name the decision that has been hardest to make, and the person who currently translates between the business and the developers. That pair usually shows everything.

The first step is a diagnostic: two weeks, CZK 60,000 (about €2,480), fixed. You leave knowing what the system does today, what blocks change, and what to do first. What I need from you: access to the code and to the running system, and an hour each with two or three people who own it. The two weeks start on the day that access is open.

contact@tsiber.com
Callback

I will call you back

Leave a number and one line about the system. I call and ask what I would have asked by email.

The number is used for this call only.